Guided walkthrough

How a CoilRig operator actually uses this

SS
It’s clickable — go anywhere

A working day, not a slideshow

Every table row and card opens a detail panel you can act in. Follow the six steps below the way a CoilRig operator would, or just click into anything that looks interesting — nothing here is a dead end.

Jump to Build Jobs
Step 1

Start your day on the Dashboard

The morning glance: what’s on the floor, what’s on rental, what money is committed, and what needs attention today.

  • Read the “Needs attention” feed — overdue builds, on-hold jobs and late POs in one list
  • Click the “Components / rig” card to jump straight into the bill of materials
Step 2

Run a build job

You have 7 rigs in build. Click any job to open it, then move it through the workshop as work completes.

  • Click a row to open the job, then hit “Advance to …” to push it to the next stage (it saves live)
  • Use “New build job” to open a work order — try saving with an empty customer to see validation
  • Open a job → Edit to change the stage, value or progress
Step 3

Open the rig’s bill of materials

The CTEnergy850 is 3,969 components deep. Expand it the way an engineer thinks — system → sub-assembly → part.

  • Expand “Coiled Tubing Injector Head”, then click a part to inspect its supplier, cost and stock
  • Hit “Single-source risk” to see the parts with only one supplier — the engine, BOP and injector chain
  • Search “valve” to find any part across the whole rig instantly
Step 4

Check stock before you commit

Stores and reorder points for every purchased part, with single-source parts flagged so you know where the risk sits.

  • Toggle “Below reorder” to see what needs ordering
  • Click a low part to see the suggested order quantity
Step 5

Work with a supplier

All 200 suppliers, filterable by trade — plus the purchase orders feeding each build.

  • Click a supplier to see exactly which parts they supply and their recent POs
  • Switch to “Purchase Orders”, filter to “Overdue”, and open one to see the linked build job
Step 6

Keep the field fleet running

Every rig you’ve sold, rented or have in for service — with utilisation, day-rates and what’s due.

  • Click a rig card to see its service history
  • Open the “Service jobs” tab and click a breakdown to see the detail

This is a tailored demonstration of CoilRig’s own operation — built by Praxa Tech. Figures are illustrative.